top of page

Grid Guru Sign Up & Submit

Step-by-Step:

How to Register with Grid Guru and Submit a Job


Grid Guru logo and text on paper, phone displaying app on laptop. Guide on registering and submitting jobs, with green and blue accents.

Simple. Structured. Stress-Free.


For many renewable installers, paperwork isn’t the hard part — it’s the time it steals from installs, quoting, and growing the business.

That’s exactly why we built the Grid Guru sign-up and submission system.

Instead of back-and-forth emails, missing documents, and last-minute DNO headaches, we’ve created a structured process that keeps everything organised from day one.

And once you’re set up — submitting jobs takes minutes.


What Happens When You Sign Up?


Signing up with Grid Guru is a one-time process.

You complete a short online registration form where we collect:


  • Your company details

  • Competent Person Scheme information

  • Key contact information


This allows us to build your installer profile properly in our system.

Once that’s done, you’re ready to submit jobs whenever you need us.

No repeated onboarding. No repeated explanations.


How the Job Submission Process Works


When you have a new installation ready for DNO application or Handover Pack completion, you simply complete our structured job submission form.


You’ll upload:

  • System design

  • Inverter make & model

  • Site address & MPAN

  • Photos (fuse, meter, install, etc.)

  • Test results & commissioning details

  • Any supporting documents


Our form guides you through exactly what’s required — so nothing gets missed.

That means fewer delays, fewer DNO queries, and faster approvals.


What Happens After You Submit?


Once your job lands with us:


  • We review the documentation

  • Prepare and submit your G98 or G99 application fast track

  • Produce your full MCS-compliant handover pack

  • Handle any DNO correspondence

  • Keep you updated as the application progresses


You install. We handle the compliance.


Why Installers Like the System


✔ Clear document checklist

✔ No chasing for missing information

✔ Faster DNO approvals

✔ Professional, consistent paperwork

✔ Reduced admin stress


We’ve designed it to feel like having your own in-house compliance department — without the overhead.


Conclusion


Grid connection admin shouldn’t slow down your business.

Our sign-up and submission process is built to be structured, repeatable, and efficient — whether you're submitting one job a month or multiple commercial installs per week.

Once you’re registered, you’re ready to submit whenever you need us.


Ready to Get Started?


If you're an installer and want to streamline your paperwork today, sign up below:

Or submit your next job here:


Stay Connected


Watch our latest vlog where we walk through the full process step-by-step.

Follow Grid Guru for weekly industry updates, compliance insights, and smarter ways to manage your admin.


Grid Guru – Powerful Solutions. Minimal Paperwork. Let us handle the forms, so you can focus on the future.



Ready to Get Started?



If you’re an installer and want to hand off all of your admin starting today, click below to submit your next job:


or

Contact us directly

T: 02920 609009




Stay Connected


Don’t forget to check out our latest vlog explaining the service visually:

Red YouTube logo with a white play button in the center, set against a plain background. Bold colors, no visible text or actions.




And follow us on social media for weekly tips, industry updates, and smart shortcuts for installers:


Blue circle with the white Facebook "f" logo centered on a transparent background, conveying a sense of social media connection.
Black square with a bold white "X" in the center, signifying a modern, minimalist logo design.
LinkedIn logo with a white "in" on a blue circular background.





Grid Guru – Powerful Solutions. Minimal Paperwork.

Let us handle the forms, so you can focus on the future.




bottom of page